Permits for Colton flatwork go through the City of Colton Development Services counter at 659 North La Cadena Drive, and we file them rather than leaving it to you. Anything that changes a driveway approach or the way a lot drains gets a plan check; a rear patio replaced on its own footprint usually does not. Colton also runs its own electric and water utilities instead of buying them in, so a pour that needs a service line located waits on the city, not on Edison.
Our crews come down Sierra Avenue and pick up the 10 east, which puts most Colton addresses about twenty minutes from the yard. We work Cooley Ranch and the tracts north of the freeway, the older grid of South Colton around Rancho Avenue, Sunny Slope where the ground starts to climb, and the Hunts Lane blocks near the Loma Linda line. A Cooley Ranch driveway from 1978 and a South Colton driveway from 1948 are two different demolitions before they are two different pours.
The railroad is a scheduling fact in Colton, not a piece of history. Union Pacific and BNSF meet at Colton Crossing and their mainlines cut the town in half, and although the junction itself was flown over in 2013, the surface-street crossings were not. A ready-mix truck has a limited window between batching and discharge, so we book Colton pours for early starts and route them clear of the tracks. The batch plants along the Santa Ana wash are closer to your driveway than our yard is.