Serving Fontana, CA and surrounding areas.(909) 697-3243
Fontana Concrete Pro

Decorative Concrete in Fontana, CA, on a New Pour or an Old Slab

Fontana Concrete Pro colors, stains, exposes and saw-cuts concrete across this city, on a fresh pour or bonded onto a slab that is still sound. Every estimate is measured and written on site.

Google reviewsFacebook reviewsBetter Business Bureau reviews5.0 Stars Rated by our customers · Google, Facebook and the BBB
Stained and saw-cut concrete patio at a home in north Fontana
Crew rolling sealer onto a stained concrete slab in Fontana

Four decisions, not one product

How a Decorative Finish Is Chosen in Fontana

Decorative concrete is a set of four decisions rather than one product. Color can be mixed through the load so it runs the full depth, or reacted into the top of a slab that is already down. The surface can be washed back to show the stone the mix was made with, or left plain and scored with saw cuts that read as tile or flagstone. Each answers a different question, and the one that comes first is whether you are pouring new concrete or keeping what you have.

Fontana Concrete Pro has been finishing concrete here since 2019, and Andre Whitfield, who put in 18 years on flatwork crews first, lays the color himself. Fontana splits neatly for this trade. The blocks south of Valley Boulevard went in during the 1950s, and their slabs are usually sound enough that decorative work here means resurfacing rather than replacing. North of the 210 the concrete is newer, and the finish gets chosen at the same time as the pour.

Finishes go down under a CSLB C-8 concrete license with liability insurance on every job, to the California Residential Code, and anything that reaches the public walk is cleared with Building & Safety before a grinder comes off the truck. No finish can hold a slab still, so the concrete is cored and read before a color is discussed. Every job carries a written workmanship guarantee against defects in how it was built. Every estimate is measured and written on site.

Warning signs

When does a decorative finish in Fontana need redoing?

Stain gone blotchy

Acid stain reacts with the lime in the concrete, so it is meant to be uneven. When patches turn pale with a hard edge instead of a soft one, the reacted layer has been walked off or scrubbed away with something acidic, and no amount of fresh sealer brings it back.

Stones working loose

On exposed aggregate the paste around each stone is the only thing holding it. Once pebbles come out under a thumbnail, or bare gray islands show through where the pattern used to be, that paste is spent. Rinsing and sealing over it loses more stone every wet winter.

Saw cuts packed solid

Cut lines are what make a scored pattern read from standing height, and the deepest of them is a quarter of an inch. Fill them with lawn grit and hose silt and the whole face flattens back to a plain slab. Blowing them clear is upkeep; having to recut them is not.

A slab that darkens when wet

Concrete that goes two shades deeper wherever the hose lands is drinking water, which means the film holding the finish down has gone. Left over a winter, that water carries salt up underneath the color and lifts it from below rather than wearing it off the top.

What's included

Every Decorative Finish in Fontana Includes

Standard on decorative work, none of it billed as an extra. Half the list is about what the finish is going onto, because on a resurfacing job the old slab is the foundation and nothing laid over it outlasts it.

The slab cored first

The existing concrete is drilled and checked for depth, rocking and live cracks before anything is quoted over the top of it.

A sample in your yard

A test panel is left on site in daylight for a day, since stain and integral color both read differently outdoors than on a chip.

Grinding and a bond coat

A resurfaced slab is ground back to open concrete and primed, so the new layer keys into it instead of sitting on old sealer.

Cracks chased and bridged

Existing cracks are cut out, filled and worked into the cut layout, because a crack that is ignored copies straight through a finish.

Color to a written spec

Integral, stain or aggregate, named on the estimate with its batch reference, so what arrives on the day is what you approved.

Cuts chalked full size

The pattern is set out on the slab and walked before the saw starts, so lines land on the edges of the space rather than at random.

Neutralized and rinsed

Acid work is neutralized and washed until the water runs clear, since residue trapped under a sealer keeps eating at the color.

Two coats and a date

Two sealer coats and a written workmanship guarantee against defects in how it was built, with the date the next coat is due written onto it.

Your options

Four Decorative Finishes for Fontana Concrete, Compared

Four ways to finish a slab here, set against how deep the color goes, how the face holds up in an unshaded yard and what each asks of you afterward. All four can be laid on new concrete; only one of them can be laid on old.

OptionWhere the color isFace in full sunResealingSuits
Integral colorThrough the full 4 inchesLightens slowly and evenlyEvery 3 yearsNew pours in west-facing yards
Acid stainingReacted into the top 1/16 inchMottles further as it wearsEvery 2 to 3 yearsSound slabs already in the ground
Exposed aggregateNone added, the stone is the colorThe toughest of the fourEvery 4 yearsDrives, side paths and pool surrounds
Saw-cut and polishedIn the cut lines and the sheenDulls before it discolorsEvery 2 years outdoorsGarage floors and covered patios

Aggregate lasts longest for the least attention, and staining is the only one of the four that works on concrete already in the ground.

Exposed aggregate concrete driveway at a 1950s Fontana home

Local knowledge

What Decorative Concrete in Fontana Has to Survive

Two things set this work apart in Fontana: most of it goes over concrete that is already down, and anything laid outdoors has to sit through afternoons in the mid-90s.

South of Valley Boulevard the tracts date from the 1950s, and the patios and paths poured with them were built thick and jointed close. A slab that has not cracked in seventy winters does not need breaking out, it needs grinding flat, priming and finishing. So we core it at the visit, look for rocking at the joints and say then whether it will carry an overlay. Where it will not, the tear-out is written as its own line rather than found halfway through the job.

Sun is the other half. From May to October an unshaded slab runs far hotter than the air around it, and ultraviolet is what breaks down the film holding a decorative finish in place. So the sealer is the wearing part, not the color: outdoors it goes on in two coats and the date the next one is due is written on the paperwork, usually 2 to 3 years and nearer 2 where there is no tree over the frontage. Resealing on time is the difference between a finish at ten years and one at four.

Our process

The Order a Fontana Decorative Finish Goes On In

Five stages, and the first two settle almost everything, because the finish is chosen, sampled and approved before any concrete or any machine is booked. The person who cores the slab is the person who lays the color.

1

Measure and core the slab

Andre Whitfield measures the area, drills the existing concrete where there is any, and photographs what the new finish has to sit beside.

2

Samples and the spec sheet

Many north Fontana tracts are HOA-governed and approve exterior finishes, so color and cut layout go onto one sheet you can hand in.

3

Tear-out or grind back

Either the old surface comes out and base goes in, or it is ground to open concrete, cracks chased and a bond coat rolled over it.

4

Color, expose or cut

Each finish has its own order: color goes in with the concrete, aggregate is washed back the same evening, saw cuts follow next morning.

5

Neutralize, cure and seal

Acid work is neutralized and rinsed, the slab cured, then two sealer coats and a walk-through with the reseal date on the paperwork.

What moves the estimate

What Changes the Figure on a Fontana Decorative Slab?

Area sets the floor. Nearly all the difference above it comes from what happens before the finish, whether the concrete stays or goes, and how much grinding and crack work it takes to get it flat. Every estimate is measured and written on site.

Whether the old slab stays

Resurfacing skips the tear-out, the haulage and the base. It only works on concrete that cores sound, which is what the visit settles.

The finish you pick

Integral color is one instruction at the batch plant. An acid stain is applied, neutralized and rinsed by hand, in passes, across two days.

Cut layout and borders

A grid of straight cuts runs quickly. A border in a second color, or curves around a planter, means masking and another pass on the slab.

Getting a machine in back

Side gates on the older Fontana lots run about 3 feet, so a grinder goes through in pieces and the prep takes a day longer than it reads.

Coring the slab and writing the figure costs you nothing, and someone rings you within 1 business day to fix a start date. (909) 697-3243 or send us a message.

Ready to price a finish for your Fontana slab?

Use the form, or phone and someone rings you back within 1 business day. Andre Whitfield drills the concrete you already have, leaves a sample panel on it, and puts the figure in writing at the end of the visit.

Request a Free Estimate

Written on site · No obligation

By submitting, you agree to our disclosure and consent terms, including being contacted by Fontana Concrete Pro.

Reviews

Fontana Homeowners on the Finishes They Chose

Three decorative jobs in this city in the owners own words. Two of them are finishes laid over concrete that was already there, which is most of what this trade is here.

Google review

“Our back patio was poured when the house went up in 1956 and I assumed it had to come out. He drilled it, said it was sound and ground it flat instead. It has been stained a warm brown for two summers now and there is not a crack through it.”

D. Marroquin, FontanaDecorative Concrete · Google · 2026
Google review

“We wanted the new drive to sit next to the entry the builder left without breaking any of it up. They exposed the aggregate so the stone read the same, sealed both ends of it and left me the date the next coat is due. Four years, in writing.”

S. Okonkwo, Sierra LakesDecorative Concrete · Google · 2026
Facebook review

“The old sealer had gone milky and the slab went dark every time we hosed it down. They stripped the lot back, recut the pattern lines that had silted up and put two coats on. It reads as a new floor and it cost a fraction of replacing it.”

R. Bhatt, FontanaDecorative Concrete · Facebook · 2025

FAQ

Decorative Concrete Questions Asked in Fontana

What people here settle before choosing a finish: what will go over an old slab, what survives an unshaded yard, and how often the sealer has to be done again.

(909) 697-3243
  • How much does decorative concrete cost in Fontana?

    Two things move it: the area, and whether there is concrete under it already. A slab that cores sound and needs only grinding and a bond coat skips the tear-out, the haulage and the base entirely. Above that the finish sets the labor: integral color is one instruction at the batch plant, while a stain is applied, neutralized and rinsed by hand across two days. Every estimate is measured and written on site.

  • Can a decorative finish go over my existing concrete?

    Yes, if the slab cores sound and sits still. We drill it at the visit to read the depth, press the joints for rocking and follow the cracks: a hairline is chased out and bridged, but concrete that moves under a foot copies that movement up through any finish inside a couple of winters. South of Valley Boulevard most 1950s slabs pass this.

  • Which decorative finish lasts longest in the Fontana sun?

    Exposed aggregate, because there is no applied color in it to lose, the stone in the mix is the color, and it is as ultraviolet-proof as gravel. Integral color comes next, since it runs through all 4 inches and what wears off the top is replaced by the same tone underneath. Stains and saw-cut work last well too, but they lean harder on the sealer above them.

  • How often does a decorative slab need resealing here?

    Every 2 to 3 years outdoors, and nearer 2 on a frontage with nothing shading it from May to October. The sealer is the film that holds the finish and takes the ultraviolet, so it is the part built to be replaced rather than the color under it. Indoors or beneath a patio cover, 4 years is normal. Yours is dated on the paperwork at hand-over.

  • What is the difference between decorative and stamped concrete?

    Stamping is one member of the family rather than a separate trade. It presses a texture into concrete while the slab is still open, so it only works on a fresh pour and it has to be finished in a single afternoon. Everything else here, color, stain, exposed aggregate, saw cuts, can go on wet concrete or on a slab that has been down for decades. Stamped work has its own page.

  • Will an acid stain match a color chart exactly?

    No, and anything that did would not be an acid stain. The color comes out of a chemical reaction with the lime in that particular slab, so its age, its mix and whatever has been spilled on it all show through as mottling. That variation is the reason people choose it. We leave a test panel on your own concrete in daylight, and what you approve is the panel.

  • Can decorative work be done through a Fontana summer?

    Yes, with the hours moved. Above 95 degrees a sealer coat rolled onto a hot slab flashes off before it has properly wet the surface, and it dries cloudy. Acid reacts faster in that heat as well, which shortens the window for washing it back evenly. From June to September the finish work starts at first light and stops by mid-morning, with sealing kept for the evening.

  • How long before we can walk on the new finish?

    Feet at 24 hours after the last sealer coat, furniture at 72 hours, and vehicles at 7 days on a new pour. On a resurfaced slab the wait is shorter, because the concrete underneath cured years ago and the clock runs only on the overlay and the coats. Either way keep sprinklers off it the first week, since water spotting a green sealer leaves a mark.

Service area

Where We Lay Decorative Finishes Around Fontana

Ordered by distance from the office, these are the towns we stain, expose and cut concrete in, across 4 counties. The sample boards and the saw travel to every one of them, and each name below opens that town.

Show All Areas We Serve

Get a Fontana Decorative Finish Measured

One visit, a core drilled through whatever is there now, a sample panel left behind and a written figure. Tell us when you book whether the concrete is already down, because that changes half of the answer.