Foundation raising is jacking a building up off the concrete it stands on. Screw jacks are set on cribbing under the framing, the whole footprint goes up together in fractions of an inch, and the house then waits in the air on timber while something is done underneath: a failed foundation cut out and replaced, a settled side brought back to the plane it was built on, or the underside opened to working height. The house is what moves. Nothing is injected and nothing is patched from above.
The survey is Andre Whitfield's own, before anybody mentions a jack: 18 years on Inland Empire crews taught him a floor says more than a crack does. Two licenses do this job and Fontana Concrete Pro holds one. CSLB C-8 covers forming, pouring and placing concrete, the new footing, the grade beam, the pier caps. Raising, cribbing and underpinning is Class C-21, Building Moving and Demolition, so the lift goes to a C-21 contractor on the same drawing. Both names go on your estimate.
None of it is exempt. An engineer surveys the floors, reports on what moved and details the replacement; a soils report settles what the new support may bear on. The set is filed on Build Fontana at Building & Safety. Under Residential Code section R109.1.1 the ground gets read open, excavation done, forms erected, reinforcing tied and held off the dirt, and no truck is called till it has been. The concrete carries a written workmanship guarantee against defects in how it was built.