Lake Mathews is unincorporated, so a permit here is not a city matter. Plans go to the Riverside County Building and Safety Department, and anything that moves earth on a slope needs a grading permit from the county as well, which we apply for with the plans. We get here from our yard in Fontana by taking Interstate 15 south to Cajalco Road and heading east, a drive of about 28 miles, so a Lake Mathews job is booked in full days rather than half days.
The lake itself is Metropolitan Water District ground, the end of the Colorado River Aqueduct, and the community sits on the slopes above it between Cajalco Road and El Sobrante Road. Houses were built one at a time on lots of an acre and up, many of them horse properties, so a drive can be 200 feet long and the last stretch of it is often still gravel. We measure that run with a wheel, not a tape, and write the figure for the whole length so there is no second number later.
Access is the other thing a plan has to settle. A mixer can reach almost any point on a Lake Mathews lot, which cuts the labor of a big pour, but it arrives on a dirt track or a shared private road, and a loaded truck rutting it in February is a complaint we would rather avoid. Between December and March we pour on days the road has dried, and from June to September we start at 6 in the morning, because the granite holds the heat and noon concrete sets before it is finished.